Cleaning and Replacement of Dust-proof Net of Vacuum Oil Filter

2019/8/1??????view:

  1. Clean the entrance dust-proof filter

  Tools needed:

  10mm, 17mm open wrench or socket wrench.

  The dirt shield for blocking coarse particles is located at the inlet flange of the pump (7/57). It should be kept clean to avoid a drop in pumping speed.

  The dirt shield is composed of two metal screen sieves. The outer screen can be seen when the intake pipeline is removed. If it's only slightly dirty, just remove the dirt from the outside of the network. If the net cover is dirty, remove the import valve orchid. To this end, remove the fastening screw at the top of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom of the cover (7/94a), and remove the cover.

  Remove four screws and remove the intake flange (7/57) and gasket (7/55).

  Remove the clasp from the intake flange (7/57). Remove two metal screen sieves and wash them with appropriate solvent.

  Reload in reverse order. We recommend replacing the original pad with a new pad (7/55).

  warning

  According to the process involved, hazardous substances may spill over from pumps and oils. Take corresponding measures. Comply with safety regulations.

  Important Notes

  When handling used oil, please observe the relevant environmental regulations!

  Watch out

  Used seals must not be installed; new seals must be installed.

  2. Check the anti-return valve

  Tools needed:

  10mm, 17mm open wrench or socket wrench.

  Adjustment ring: 71072333

  To ensure the normal operation of the pump, keep the anti-return valve clean and clean. If the process gas inhaled by the pump contains a large amount of dust or dirt, we strongly recommend that a dust filter be installed before the pump inlet (see Section 1.4).

  First remove the intake pipe.

  Then remove the fastening screw at the top of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom (7/94a), and remove the cover.

  Remove four screws and remove intake flange (7/57) and gasket (7/55).

  Remove spring and oil return valve.

  If the anti-return valve is too tight, press the spring a little. The upper edge of the anti-ventilation line should be about 1-2 mm from the lower side of the intake port.

  Reload the intake. We recommend replacing the new gasket (7/55).

  The flat side of the anti-return valve is down.

  The large diameter end of the spring is downward and the small diameter end is opposite to the flat side of the anti-return valve. The anti-return oil valve has a ring of sealing line with one side facing up.

  warning

  According to the process involved, hazardous substances may spill over from pumps and oils. Take corresponding measures. Comply with safety regulations.

  Importantly, when dealing with used oil, please observe the relevant environmental regulations!

  Be careful not to install used seals; be sure to install new seals.


主站蜘蛛池模板: 一区二区在线 大桥未久播放 | 人人狠狠 | 一级骚片超级骚在线观看 | 欧美一区二区三区播放 | 国产欧美一区二区 | 亚洲综合久久伊人热 | 日本在线日本中文字幕日本在线视频播放 | 亚洲永久精品一区二区三区 | 日韩欧美高清 | 久久88台湾三级香港三级 | 99视频精品全部在线播放 | 日本成片| 91网址 | 国产精品极品美女免费观看 | 久久精品国产一区 | 久久久精品免费热线观看 | 国产啪 | 性猛交╳xxx乱大交 性猛交xxxxx按摩中国 | 亚洲片在线观看 | 日本免费va毛片在线看大 | 亚洲日韩天堂 | 中文字幕乱码视频中文字幕14 | 欧美不卡二区 | 久久夜色精品国产噜噜 | 日本成人久久 | 4138殇情影院理论片午夜 | 久久久噜久噜久久综合 | 国产性做久久久久久 | 亚洲第6页 | 成人国产精品久久久免费 | 在线观看国产小视频 | 欧美人成毛片在线播放 | 久久精品国产精品亚洲人人 | 天天搞一搞| zsvdy午夜片| 亚洲欧美日韩国产综合高清 | 偷偷久久 | 日韩日韩日韩手机看片自拍 | 欧美日韩精品一区二区三区视频 | 特级黄色毛片 | 青青青免费视频精品99 |